Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse

Product Details
Customization: Available
Manufacturing Method: Machine Welding
Material: Carbon Steel
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
25
Plant Area
1400 square meters
  • Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
  • Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
  • Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
  • Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
  • Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
  • Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
Find Similar Products
  • Overview
  • Product Parameters
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
TWA-772
Application Fields
Warehouse, Workshop, Shed, Hangar
Purlin
C.Z Shape Steel Channel
Roofing
Sandwich Panel. Single Steel Sheet
Certificate
ISO9001
Window
Aluminum Alloy Window
Door
Sandwich Panel Door
Main Frame
Solid H-Shape Steel Beam
Design Parameter
Wind Load, Snow Load and Earthquake
Service
Design, Engineering, Erection
Application
Steel Workshop, Steel Structure Platform
Type
H-Section Steel
Standard
GB
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steel Column
Transport Package
20FT, 40hq
Specification
Q345B, Q235B
Trademark
XTW, Low-alloy High-tensile Structural Steel
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
20, 000 Ton/ Year

Packaging & Delivery

Package Size
11000.00cm * 2200.00cm * 2200.00cm
Package Gross Weight
23000.000kg

Product Description

Product Parameters

Prefabricated steel structure buildings including the main steel structures, secondary steel structures, cladding materials, window&doors, bolts etc.
we will according your project to design and quote , will offer the low costs and stable building for you.

 

Name Industrial sheds/ warehouse
Material Q235B,Q355B galvanized or painted steel
Main frame H-section steel column & steel beam
Purlin C/ Z- section steel purlin
Roof and wall a) Color-coated corrugated steel sheet,
b) Rock Wool Sandwich Panels,
c) EPS Sandwich Panels,
d) Glass wool Sandwich Panels,
e) PU sandwich panel
Door

a)Rolling up door,
b)Sliding door

c)Sandwich door/ security door/ PVC door

Window PVC /Steel or Aluminum Alloy frame window
Down spout Round PVC pipe
Usage All kinds of industrial workshop, warehouse, poultry shed, supermarket, hangar, etc
Service life 50Years


Product parameters

Main steel structure
(columns and beams)
1.Steel Q345(S355JR) or Q235(S235JR)H shape
2. Straight cross-section or Variable cross-section
Roof
 
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile
Wall
 
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile
Doors
 
Steel rolling shutter or others
Windows
 
Alu. Alloy window,or others
Edge Cover
 
Steel sheet 0.5mm thickness
Bolts M24,M22,M16 embedded bolts,intensive bolts,galvanized ordinary bolts,high-strength bolts, etc
Others options
 
Skylight panel,Roof ventilator,Down pipe,Galvanized,Crane,sanitary Products
Foundation
 
Cement and steel foundation bolts

Product Show
Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse

Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse


Detailed Images
Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse

 
Company Profile

Company Introduction


We are manufacturer.

With more than 18 years history, Qingdao Taiwei Steel Structure Co., Ltd wiskind has vast experiences in design, production, transportation and installation of steel building systems. We have been committed to providing customers with the most reasonable and economical solution, so that the customers can achieve steel building dream. Based on 18 years of development, we have a professional management team in steel structure design, production and installation, meanwhile, we continue to develop new technologies, new panels, and access to a number of national patents. The production management has obtained ISO9001 certification.


Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse
Factory Direct Cost of Prefabricated Construction Cheap Steel Structure Building Warehouse

 
FAQ

FAQ


1.How about the cost of prefabricated building?
Compared with concrete buildings, assembly buildings are lighter in quality and more economical. Factory production to reduce the labor intensity and time of the installation workers at the construction site.

 
2.How long is the service life of the portal H-type steel frame?
The service life of the main steel frame can last for 50years.

 
3.Is the steel frame safe and stable?
Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)

4.What is the advantages of the steel frame compared to the traditional building?
The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.

5.How can I assemble the portal H-type steel frame?
All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier