• New Design Building Structure Steel Fabrication
  • New Design Building Structure Steel Fabrication
  • New Design Building Structure Steel Fabrication
  • New Design Building Structure Steel Fabrication
  • New Design Building Structure Steel Fabrication
  • New Design Building Structure Steel Fabrication

New Design Building Structure Steel Fabrication

Material: Steel Structure
Usage: Warehouse, Dormitories, Temporary Offices, Workshop
Certification: ISO
Customized: Customized
Application: Warehouse, Workshop, Shed, Hangar
Life Time: >30 Years
Customization:

Contact Supplier

Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
building structure steel fabrication
Surface Treatment
Painting and Hot DIP Galvanize
Cladding Material
Steel Color Sheets/Sandwich Panels
Connection Form
Bolt Connection
Main Steel Frame
H Steel, Z or C Purlin
Forming
Welded
Design Parameter
Wind Load, Snow Load and Earthquake
Service
Design, Engineering, Erection
Size
According to Customer Requirement
Transport Package
Common Package
Specification
Q345B, Q235B
Trademark
TW
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
20000000 Ton/ Year

Product Description

New design building structure steel fabrication


Advantage:


1. We have a group of professional engineers, most of whom has more than 10 years' experiences in architecture field.

2. Established for more than ten years, our company has got a various of experiences in design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.
 
3. We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, slitter, shot blasting machines and so on.

4. Besides manufacture according to customers' requirements, we also established a set of production standards.  With perfect technique, excellent quality, reasonable price, top-grade services, we have won the favor of lots of customers at home and abroad.  
 
5. "Moral personality decides product quality." is our guarantee to the products. "Customers come first." is our everlasting pursuit. Believe your choice; we'll give you a satisfied answer.

 
Main steel structure
(columns and beams)
1.Steel Q345(S355JR) or Q235(S235JR) H shape
2. Straight cross-section or Variable cross-section
Sub steel structure 1.Material Q235(S235JR) steel
2.Bolt connections. Anti-rust painted or galvanized
3. Bracing:X-type or V-type or other type bracing made from angle, round pipe, etc
4. Purlin:C or Z type: Size from C120~C320, Z100~Z200
Roof Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile
Wall Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile
Doors Steel rolling shutter or others
Windows Alu. Alloy window,or others
Edge Cover Steel sheet 0.5mm thickness
Bolts M24,M22,M16 embedded bolts,intensive bolts,galvanized ordinary bolts,high-strength bolts, etc
Others options Skylight panel,Roof ventilator,Down pipe,Galvanized,Crane,sanitary Products, etc
Foundation Cement and steel foundation bolts

New Design Building Structure Steel Fabrication
New Design Building Structure Steel Fabrication
New Design Building Structure Steel Fabrication
New Design Building Structure Steel Fabrication


Packaging & Delivery

Steel structure building:
  1. According to container size, container of 20 feet:Inside capacity is 5.69m x 2.34m x 2.18m,Gross weight of allocation is generally 17.5 ton,volumn is 24-26m3. container of 40 feet: Inside capacity is 11.8m x 2.34m x 2.18m,Gross weight of allocation is generally 22 ton,volumn is 54m.
  2. According to the requirements of the customer.

Delivery Time: 30days after got the deposit

New Design Building Structure Steel Fabrication
New Design Building Structure Steel Fabrication


FAQ:


1.Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!

2.Economical Solution, compare to concrete building, prefabricated building will be much more Economical

3.Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.

4.Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.

5.Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)
 

Send your message to this supplier

*From:
*To:
avatar Mr. Randy Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
25
Plant Area
1400 square meters