• Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
  • Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
  • Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
  • Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
  • Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
  • Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building

Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building

Size: Designed as Per Customer′s Requirement
Main Frame: H Section Steel, C, Z Section Steel
Design Parameter: Wind Load, Snow Load, Earthquake
Surface Treatment: Painted or Galvanized
Window: Aluminum Alloy Window or Plastic Steel Window
MOQ: 200m2
Customization:
Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
XTW-KA510
Wall and Roof Sandwich Panel
EPS, Rock Wool, Glass Wool, PU
Material
Steel Structure
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification
ISO, CE, SGS
Customized
Customized
Transport Package
Common Package
Specification
q
Trademark
XTW
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
2000 Ton/ Year

Product Description

Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building

Product Description

1. Possesses a wide span, with either a single or multiple spans and can have a maximum span clearance distance in 36m without middle columns.
2. Low cost with unit price ranging from USD30 to USD 87 per square meter FOB according to customer's requirements.
3. Fast construction and easy installation
4. Has a service life of more than 50 years
5. The hangar are also environmentally friendly, have a stable structure, are earthquake resistance, water proof, and energy saving
Product application:
Widely used as industry factory building, warehouse, gymnasium, poultry shed, school and medical clinic, garage, workshop, etc.Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building



Product Details
1 main steel frame Q235 Q345 steel H beam and comlumns, painted or galvanized, box steel, galvanized C section or steel pipe
2. Secondary frame : galvanized C or Z purlin , steel bracing , tie bar , knee brace , flashing etc.
. Roof panel : EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and Pu sandwich panel or steel sheet
  Wall panel : Sandwich Panel or Corrugated Steel Sheet
  Tie Rod: Circular Steel Tube
  Brace: Round Bar
  Knee Brace: Angle Steel
  Roof Gutter: Color Steel Sheet or Galvalume sheet
  Rainspout: PVC Pipe
3. Door: Sliding Sandwich Panel Door or rolling Metal Door
  Windows: PVC or Aluminum Alloy Window
  Connecting: Anchor bolts, intensive bolt , galvanized machine bolt, self-drilling screws
4. Packing: according to the pack list made by our engineer
5. Drawing: We can supply structural steel engineering design and instalaltion drawing
 Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
Project Exihibition
Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building
Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building



Delivery & Payment
Packaging Details: Seaworthy export standard, 20' GP, 40' GP, 40' HQ, 40' OT. 
Delivery Details: 20-45 days after received the deposit.
Payment Details: T/T 30% as deposit, the 70% balanced before loading the containersDouble Slope Fast Construction Prefabricated Steel Frame Warehouse Building


About Us
Located in China and founded in 2009,Qingdao Tai Wei steel Structure Co.,Ltd has been specializing in designing and manufacturing steel structure workshop,Prefabricated steel warehouse building,steel aircraft hanger,Poultry house and container houses,Selling of steel structure and under taking various kind of steel structure project.
Double Slope Fast Construction Prefabricated Steel Frame Warehouse Building

FAQ
1.What's the common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.
2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balancebefore loading by TT.
3.What is the delivery time?
It depends on order quantities and how complicated it is.Generally speaking,the delivery time will be within 30 to 50days after deposit.
4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
25
Plant Area
1400 square meters