• Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
  • Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
  • Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
  • Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
  • Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
  • Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building

Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building

Material: Steel Structure
Usage: Warehouse, Dormitories, Temporary Offices, Workshop
Certification: ISO
Customized: Customized
Main Frame: Welded H Steel
Surface Treatment: Painted or Galvanized
Customization:
Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
XTW-KA1108
Window
Aluminum Alloy Window
Wall
Glass Wool Sandwich Panel
Color
White Gray,Navy Blue,Red
Brick Wall
0.8m or 1.2m
Steel Grade
Q235B, Q355b
Roof
Glass Wool Sandwich Panel
Door
Electric Rolling Door
Applicaiton
Steel Building,Steel House, Warehouse
Column Bracing
Angle Steel
Horizotal Bracing
Round Steel
Ventilation
Roof Ventilator
Frame Type
Portal Frame
Origin of Country
Qingdao, China
Transport Package
Common Package
Specification
Q355B
Trademark
XTW
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
20000 Ton/ Year

Product Description

Fast assembled light steel structure hangar prefabricated stotage shed building 
Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building


Features of Steel Structure Hangar
1.Flexible layout
2.Good ductility,strong plasticity and deformability, hign seismic resistant and wind resistant
3.Quick build and long service time.
4.Light weight,high quality but low cost
5.Environmental, material can be 100% recycled and degraded.




Product Details
Main Steel Frame Column Q235, Q355 Welded H Section Steel
Beam Q235, Q355 Welded H Section Steel
Standard Parts M20,M24,Anchor Bolt,High Strength Bolt
Secondary Frame Purlin Q235 C and Z purlin
Knee brace  Q235 Angle Steel 
Tie Rod Q235 Circular Steel Pipe 
Bracing Brace Q235 Round Bar
  Vertical and Horizontal Support Q235 Angle Steel, Round Bar or Steel Pipe


Maintenance system
Roof Panel EPS Sandwich Panel / Glass Fiber Sandwich Panel /Rock Wool Sandwich Panle/PU Sandwich Panel
Wall Panel Sandwich Panel / Corrugated Steel Sheet
Door Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door

ALL THE DESIGN CAN BE CUSTOMIZED AS REQUIRED

Project Overview
Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building



Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building
Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building



Packing&Shipping Info
Packing:Seaworthy package that can be loaded in 20GP and 40HC or as required
Shipping:about 25-60 days after receiving the deposit according to your order amount


Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building


Payment Terms
Now we only accept 100% T/T.    T/T 30% as deposit, the 70% balance before shipment

Our advantage&Service
1. We have a group of professional engineers,most of whom have more than 10 years of experience in the construction field.
2. The company has more than a decade of experience in designing, manufacturing and installing.The staff has excellent skills. Some of them have helped customers install warehouses worldwide.
3. There are more than 80 sets of large precision and domestic advanced processing equipment, including large-scale gantry planners, antomatic submerged arc welding machines, assembly machines, slitters,sholt blasting machines etc.
4. In addition, the manufacturing according to customers' requirements, we have also established a set of production standards. With perfect technology, excellent quality, reasonable price and first-class service and first-class service,it has own the favor of many customers all over the world.
5. 'Moral personality determines product quality'. It's our guarantee for the product.' Customer First' is our enternal persuit. Believe in your choice and we will give you a satisfactory answer.


Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building


Company Profiles
Established in 2011, Qingdao Taiwei Steel Structure Co.,Ltd is a great manufacturer specialized in designing, manufacturing and installing steel structure construction for more than 10 years.
 
With advanced processing equipment , good production capacity ,professional planner and construction team,we have participated in lots of important projects such as Olympic Sailing Center,Mega Mill,Pure Floor Mill and so on.Our products have been exported more than 60 countries and regions, for instance, South Africa, India, Australia, Argentine, New Zealand, Canada, Ethiopia, Maldives etc.
 
"Credit and clients fist"is our consistent service tenet, we cherish every opportunity to cooperate with you. We're looking forward to achieve "win-win"with you.


Fast Assembled Light Steel Structure Hangar Prefabricated Stotage Shed Building

Buying Guides
1.If you have already have the finished drawing pls send to us
2.If no drawing,pls offer following info for our design:
  1)what's the size of the building you need? length*width*height
  2)what's the building used for?
  3)where do you want to build and what's the local wind load, snow load and seismic load?
  4)what's the material of roof&wall do you prefer? only single steel sheet or sheet with insulation(sandwich panel)?Enclosed pls find several types of sandwich panels.
  5)any other special requirements for the building?


FAQ
1.Are you a factory or trading company?
We're facotry

2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balancebefore loading by TT.

3.What is the delivery time?
It depends on order quantities and how complicated it is.Generally speaking,the delivery time will be within 30 to 50days after deposit.

4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
25
Plant Area
1400 square meters