Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure

Product Details
Customization: Available
Size: Customized
Main Frame: H Column and Beam
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 10 foreign trading staff(s) and 7 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (22)
  • Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
  • Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
  • Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
  • Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
  • Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
  • Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
Find Similar Products

Basic Info.

Model NO.
XTW-KA1031
Design Parameter
Wind Load, Snow Load, Earthquake
Surface Treatment
Painted or Galvanized
Window
Aluminum Alloy Window or Plastic Steel Window
Purlin
C Pulrin
Roof Cladding
Sandwich Panel
Wall Cladding
Sandwich Panel
Door
Rolling Door
Lighting
Plane Skylight Panel
Ventilation
Roof Ventilator
Parapet Wall
Sandwich Panel
Brick Wall
Customized
Bracing
Angle Steel, Round Steel
Edge Cover
0.5mm Metal Sheet
Type
H-Section Steel
Standard
GB
Trademark
Low-alloy High-tensile Structural Steel, XIANGTAIWEI
Connection Form
Bolt Connection
Member
Steel Column
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wallboard
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge, Warehouse, Construction, Building
Forming
Welded
Transport Package
Common Package
Specification
Q355B, Q235B
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
2000 Ton/ Year

Product Description

Product Description

1) Stable and Earthquake Resistance;

2) Wind resistance;

3) Long using time up to 50 years;

4) Sound insulation;

5) Environment friendly: Most of the excess material can be 100% recycled;

6) Fast construction, time saving and labor saving;

7) Lower cost and maintenance
 

Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure




Material Details
Main Parts Item Name Specification
Main Steel Frame Steel Column H shape,Box,Steel pipe,Hot rolled sheet
Steel Beam

 Q235B,Q345B

Steel rod,Steel pipe,Angel steel

Supporting System Brace  C or Z shape,Steeln purlin
Roof Purlin Q235B,Q345B 
Wall Purlin  C or Z shape,Steeln purlin
Roof Singel colorful corrugate steel sheet,Sandwich panel with EPS,Rock wool,PU,Glass wool etc.
Wall Singel colorful corrugate steel sheet,Sandwich panel with EPS,Rock wool,PU,Glass wool etc.
Accessories Bolts  Ordinary,High strength
Gutter Galvanized Steel plate,Stainless steel 
Windows Aluminum alloy-Glass,Aluminnum alloy-shutter,PVC 
Doors Sliding or Rolling door 
Downpipes PVC pipe,Color steel pipe 
Edge Cover Made of color steel sheet thickness 0.5mm 
Ventilator Stainless steel 
Crane Crane in 5 tons to 20 tons 


Project Exhibition
Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure



Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure

Packing & Delivery
Packaging Details: Seaworthy export standard, 20' GP, 40' GP, 40' HQ, 40' OT. 
Delivery Detail: 20-45 days
Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure


About Taiwei
Since 2002,Qingdao Taiwei Steel Structure Co.,Ltd is a great manufacturer specialized in designing, manufacturing and installing steel structure construction for more than 16 years.

With advanced processing equipment , good production capacity ,professional planner and construction team,we have participated in lots of important projects such as Olympic Sailing Center,Mega Mill,Pure Floor Mill and so on.Our products have been exported more than 60 countries and regions, for instance,South Africa, Ghana, Australia, Argentine, New Zealand, Canada, Ethiopia, Uganda etc.

"Credit and clients fist"is our consistent service tenet, we cherish every opportunity to cooperate with you, and will give you the satisfying service with best quality and most reasonable price


Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
 
Why Choose Us
1) Fast construction and easy installation

2) Competitive prices to meet customer needs

3) Long term service life: more than 50 years

4) Quality inspection before loading

Flexible Design Hangar Workshop Prefabricated Warehouse Construction Environmental Steel Structure
FAQ

1.Are you a manufacturer or a trading company?
We're factory.

2.What are the payment terms?
TT will be more appreciated. 30%deposit before producing, 70% balancebefore loading the containers

3.What is the delivery time?
It depends on order quantities and how complicated it is.Generally speaking,the delivery time will be within 30 to 50 days after deposit.

4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee,air tickets, accommodation, wages will be paid by buyers.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier