Customization: | Available |
---|---|
Connection Form: | Welded Connection |
Construction Member: | Steel Column |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification
Items | Specification | |
Main Steel Frame | Column | Q235, Q345 Welded H Section Steel |
Beam | Q235, Q345 Welded H Section Steel | |
Secondary Frame | Purlin | Q235 C and Z purlin |
Knee bracing | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace/ Strutting piece | Q235 Round Bar | |
Column bracing and Roof Horizontal bracing | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | EPS Sandwich Panel / Fiberglass Sandwich Panel / Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
Accessories | Window | Aluminiumn Alloy Window / UPVC Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
Downspout | PVC | |
Live load on Roof | In 120kg/Sqm (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Finishing Options | Variety of colors and textures available | |
Paint Options | Alkyd paiting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
1.Are you a factory or trading company?
We're factory with competitive price.
2.How long is the service life of the portal H-type steel frame?
The service life of the main steel frame can last for 50years.
3.Is the steel frame safe and stable?
Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)
4.What is the advantages of the steel frame compared to the traditional building?
The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.
5.How can I assemble the portal H-type steel frame?
All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.