Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)

Product Details
Customization: Available
Connection Form: Welded Connection
Construction Member: Steel Column
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 10 foreign trading staff(s) and 7 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (22)
  • Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
  • Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
  • Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
  • Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
  • Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
  • Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
Find Similar Products
  • Overview
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
Steel Structure Building
Molding Method
Cold Drawn Steel
Residential Wall Structure
Wallboard
Standard
GB
Steel Type
H-Section Steel
Structure
Steel Structure
Size
Designed as Per Customer′s Requirement
Main Frame
H Section Steel, C, Z Section Steel
Design Parameter
Wind Load, Snow Load, Earthquake
Surface Treatment
Painted or Galvanized
Window
Aluminum Alloy Window, UPVC Window
Doors
Aluminium Alloy or Roller Shutter
MOQ
200m2
Wall Panel
EPS, Rock Wool, Glass Wool, PU
Roof Panel
Rock/Glass Wool Sandwich Panel
Service
Design, Engineering, Erection
Gutter
Colored Steel Gutter, Stainless Steel Gutter
Downspouts
PVC
Connection
Welded, Bolts Connection
Material
Steel Structure
Certification
ISO, SGS
Transport Package
Common Package
Specification
Q345B, Q235B
Trademark
TW
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
2000 Ton/ Year

Packaging & Delivery

Package Size
11000.00cm * 2200.00cm * 2200.00cm
Package Gross Weight
23000.000kg

Product Description


Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)

 
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)

Model NO:TW-0139
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Customized: Customized
Steel Grade: Q235, Q345
Purlin: Purlin C or Z Section Steel
Forming: Hot-Rolled Steel
Size: up to Customers
Specification: ISO9001
HS Code: 9406000090
Material: Steel Structure
Certification: ISO, CE, SGS
Connection Form: Bolt Connection
Column & Beam: H Section Steel
Roof&Wall Panel: Steel Sheet or Sandwich Panels
Member: Steel Column & Steel Beam
Color: as Requirements
Transport Package: Standard Packaging
Origin: Qingdao, China
Product Parameters

 

Main Parts
Item Name
Specification




Main Steel Frame

Steel Column
Q235B, Q345B     
H shape, Box, Steel pipe, Hot rolled sheet

Steel Beam
Q235B, Q345B
H shape, Steel Truss, Hot rolled sheet

Brace
Q235B, Q345B
Steel rod, Steel pipe, Angle steel
Roof Purlin
C or Z shape, Steel purlin



Supporting System

Wall Purlin
Q235B, Q345B
C or Z shape, Steel purlin
Roof
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,
Wall
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,





Accessories
Bolts
Ordinary, High strength
Gutter
Galvanized Steel plate, Stainless steel
Windows
Aluminum alloy-Glass, Aluminum alloy-shutter, PVC
Doors
Sliding or Rolling door
Downpipes
PVC pipe, Color steel pipe
Edge Cover
Made of color steel sheet thickness 0.5mm
Ventilator
Stainless steel
Crane
Crane in 5 tons to 30 tons
 
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
 
Our Company
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)

 
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
 
Certifications

Certificate
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)

Production
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)


 

Packaging & Shipping

Packing and Shipping

Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
 
Installation
Eco-Friendly Light Steel Structure Construction Building Prefabricated Warehouse House (TW473J)
FAQ

FAQ

1.Are you a factory or trading company?

We're factory with competitive price.

2.How long is the service life of the portal H-type steel frame?

The service life of the main steel frame can last for 50years.

3.Is the steel frame safe and stable?

Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)

4.What is the advantages of the steel frame compared to the traditional building?

The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.   

5.How can I assemble the portal H-type steel frame?

All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.
 

Contact Us

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier