Customization: | Available |
---|---|
Connection Form: | Welded Connection |
Construction Member: | Steel Column |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main steel structure |
1.Steel Q345(S355JR) or Q235(S235JR)H shape |
Sub steel structure |
1.Material Q235(S235JR) steel |
Roof |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Wall |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Doors |
Steel rolling shutter or others |
Windows |
Alu. Alloy window,or others |
Edge Cover |
Steel sheet 0.5mm thickness |
Bolts |
M24,M22,M16 embedded bolts,intensive bolts,galvanized ordinary bolts,high-strength bolts, etc |
Others options |
Skylight panel,Roof ventilator,Down pipe,Galvanized,Crane,sanitary Products |
Foundation |
Cement and steel foundation bolts |
FAQ
1.How about the cost of prefabricated building?
Yes, compared with concrete buildings, assembly buildings are lighter in quality and more economical. Factory production to reduce the labor intensity and time of the installation workers at the construction site.
2.How long is the service life of the portal H-type steel frame?
The service life of the main steel frame can last for 50years.
3.Is the steel frame safe and stable?
Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)
4.What is the advantages of the steel frame compared to the traditional building?
The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.
5.How can I assemble the portal H-type steel frame?
All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.