Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse

Product Details
Customization: Available
Size: Designed as Per Customer′s Requirement
Main Frame: H Section Steel, C, Z Section Steel
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 10 foreign trading staff(s) and 7 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (22)
  • Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
  • Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
  • Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
  • Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
  • Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
  • Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
Find Similar Products
  • Overview
  • Product Description
  • Production
  • Product Parameters
  • Our Advantages
  • Our Customers
  • Our Service
  • Packaging & Shipping
  • Installation Instructions
Overview

Basic Info.

Model NO.
CTW-SS1
Design Parameter
Wind Load, Snow Load, Earthquake
Surface Treatment
Painted or Galvanized
Window
Aluminum Alloy Window or Plastic Steel Window
MOQ
200m2
Wall and Roof Sandwich Panel
EPS, Rock Wool, Glass Wool, PU
Material
Steel Structure
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification
ISO, CE, SGS
Customized
Customized
Transport Package
Common Package
Trademark
TW
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
2000 Ton/ Year

Product Description



Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
Product Description

Steel structure building is formed by the main framework through linking up the H beam and column, C purline, Z purline steel components. Roof and wall, which takes a variety of panels into use, combined with other components including windows and doors. The obvious advantages of steel structure are as follows: long span, high yeild and tensile strength, light weight, low cost, energy saving, brilliant appearance, efficient construction time, effective insulation, long life span, space-efficiency, good seismic performance, flexible layout, etc. 

Because of the diversification of steel structure material and the flexible design, the light steel structure projects can better meet customers' demands for space structures, and reasonable economy.
 
Production

Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
Product Parameters
 
1. Opinions 1)We can supply all kinds of steel structures, steel building, metal building, modular house,     steel frame for warehouse, workshop, garage etc, steel beams, other riveting and welding parts.
2)We can also make and develop new parts according to customers' drawings and detailed dimensions.
 
2. Specifications
 
 
 
1)Size: MOQ is 100m2, width X length X eave height, roof slope
2)Type: Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floors!
3) Base: Cement and steel foundation bolts
4)  Column and beam: Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-section or Variable cross-section!
5) Bracing: X-type or V-type or other type bracing made from angle, round pipe, etc 
6) C or z purlin: Size from C120~C320, Z100~Z200
7) Roof and wall panel: Single colorfull corrugated steel sheet0.326~0.8mm thick, (1150mm wide), or sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~100mm,
8)Accessories: Semi-transparent skylight belts, Ventilators, down pipe, Glavanized gutter, etc
9)Surface: Two lays of Anti-rust Painting!  
10) Packing: Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ!  
3. Design Parameters If you need we design for you, pls supply us the following parameter together with detail size:    
1)Live load on roof(KN/M2) 
2)Wind speed(KM/H)
3)Snow load (KG/M2)
4)Earthquake load if have
5) Demands for doors and windows
6)Crane   (if have), Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure!
 
Our Advantages

1. We have 12 professional engineers, most of whom have more than 10 years' experience in the construction industry.

2. Established for more than ten years, our company have got a various of experience in design, manufacture, packing, installation and so on. Some engineers have helped customers to install the hangar in Oceania, gypsum pop plant and fruits warehouse in Africa, etc.
 
3. We also have possessed more than 10 sets of precise and domestically advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, slitter, shot blasting machines and so on.

4. The scale of the factory is reasonable. We can provide more favorable prices according to the standards and quality of the large factories.
5. We guarantee the delivery time while ensuring the quality.

 
Our Customers

Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
Our Service

1. Consultant service
2. Primay design
3. Assist client to choose suitable construction plan
4. Price calculation
Sale Services:
1. Submission of support reaction data for foundation
2. Submission of construction drawing
3. Providing requirement of embedding
4. Construction Manual
5. Fabrication & packing
6. Delivery
After-sale Services:
1. Installation supervision
2. Instruction of using after installation completed


Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse



 
Packaging & Shipping

Packaging Details: Seaworthy export standard, 20' GP, 40' GP, 40' HQ, 40' OT. 
Delivery Detail: 20-45 days
Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse
Installation Instructions

Fast Construction Prefab Steel Structure Building Industrial Workshop Warehouse

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier