Steel Structure Prefabricated Building for Staff Dormitory

Product Details
Customization: Available
Usage: Warehouse, Workshop
Size: Designed as Per Customer′s Requirement
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 10 foreign trading staff(s) and 7 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (22)
  • Steel Structure Prefabricated Building for Staff Dormitory
  • Steel Structure Prefabricated Building for Staff Dormitory
  • Steel Structure Prefabricated Building for Staff Dormitory
  • Steel Structure Prefabricated Building for Staff Dormitory
  • Steel Structure Prefabricated Building for Staff Dormitory
  • Steel Structure Prefabricated Building for Staff Dormitory
Find Similar Products

Basic Info.

Model NO.
CTW-0022
Main Frame
H Section Steel, C, Z Section Steel
Design Parameter
Wind Load, Snow Load, Earthquake
Surface Treatment
Painted or Galvanized
Window
Aluminum Alloy Window or Plastic Steel Window
MOQ
100 Sq.M
Wall and Roof
EPS Sandwich Panel
Material
Steel Structure
Certification
ISO, CE
Customized
Customized
Transport Package
Common Package
Specification
Q345B, Q235B
Trademark
XTW
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
2000 Ton/ Month

Product Description

Steel Structure Prefabricated Building for Staff Dormitory
Steel Structure Prefabricated Building for Staff Dormitory

PRUDUCT DESCRIPTION
Environment-friendly
Lower cost and maintenance easily
Long using time up to 50 years
Stable and earthquake resistance up to 9 grade
Fast construction, time saving and labor saving
Steel Structure Prefabricated Building for Staff Dormitory


PROJECT DETAILS
Main Parts Item Name Specification
Main Steel Frame Steel Column Q235B, Q345B     
H shape, Box, Steel pipe, Hot rolled sheet
Steel Beam Q235B, Q345B
H shape, Steel Truss, Hot rolled sheet
Brace Q235B, Q345B
Steel rod, Steel pipe, Angle steel
Roof Purlin C or Z shape, Steel purlin
Supporting System Wall Purlin Q235B, Q345B
C or Z shape, Steel purlin
Roof

Single colorful corrugate steel sheet, 

Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,

Wall

Single colorful corrugate steel sheet, 

Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,

Accessories Bolts Ordinary, High strength
Gutter Galvanized Steel plate, Stainless steel
Windows Aluminum alloy-Glass, Aluminum alloy-shutter, PVC
Doors Sliding or Rolling door
Downpipes PVC pipe, Color steel pipe
Edge Cover Made of color steel sheet thickness 0.5mm
Ventilator Stainless steel
Crane Crane in 5 tons to 30 tons

Steel Structure Prefabricated Building for Staff Dormitory

DESIGN PARAMETERS
1. Wind Speed or wind load
2. Snow load
3. Anti-seismic grade


QUALIFICATION
Fabrication Qualification: Class A
Design Software: SAP2000/3D3S/PKPM


Steel Structure Prefabricated Building for Staff Dormitory
Steel Structure Prefabricated Building for Staff DormitorySteel Structure Prefabricated Building for Staff Dormitory


PAYMENT TERMS
1) Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)
2) Delivery time: 15~30 days, usually as customers' order

Steel Structure Prefabricated Building for Staff Dormitory
 
ABOUT US
Steel Structure Prefabricated Building for Staff Dormitory
Steel Structure Prefabricated Building for Staff Dormitory

FAQ
1.How about the cost of prefabricated building?

Yes, compared with concrete buildings, assembly buildings are lighter in quality and more economical. Factory production to reduce the labor intensity and time of the installation workers at the construction site.

2.How long is the service life of the portal H-type steel frame?

The service life of the main steel frame can last for 50years.

3.Is the steel frame safe and stable?

Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)

4.What is the advantages of the steel frame compared to the traditional building?

The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.   

5.How can I assemble the portal H-type steel frame?

All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.

 

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier