Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse

Product Details
Customization: Available
Layers: Single-Layer
Usage: Dust-Proof Workshop, Specialized Workshop, Textile And Electronic Processing, Warehouse
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 10 foreign trading staff(s) and 7 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (22)
  • Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
  • Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
  • Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
  • Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
  • Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
  • Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
Find Similar Products
  • Overview
  • After Sales Service
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
TW-1424
Main Frame
H Section Steel, C, Z Section Steel
Design Parameter
Wind Load, Snow Load, Earthquake
Window
Aluminum Alloy Window or Plastic Steel Window
MOQ
200m2
Wall and Roof Sandwich Panel
EPS, Rock Wool, Glass Wool, PU
Transport Package
Common Package
Trademark
TW
Origin
Qingdao
HS Code
9406900090
Production Capacity
2000t/Month

Packaging & Delivery

Package Size
11000.00cm * 2200.00cm * 2200.00cm
Package Gross Weight
23000.000kg

Product Description

Light Steel Structure Workshop Hangar Maintenance Shed Food Storage Warehouse 

Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse

Product Advantages

1. Flexible layout
2. Good ductility, strong plasticity and deformation, strong earthquake resistance and wind resistance performance
3. High construction effcience and long service life 
4. Light weight, high quality with low cost
5. Environmental protection : materials can be 100% recycled or degraded


Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse


Project Details
Main Parts
Item Name
Specification




Main Steel Frame

Steel Column
Q235B, Q345B     
H shape, Box, Steel pipe, Hot rolled sheet

Steel Beam
Q235B, Q345B
H shape, Steel Truss, Hot rolled sheet

Brace
Q235B, Q345B
Steel rod, Steel pipe, Angle steel
Roof Purlin
C or Z shape, Steel purlin



Supporting System

Wall Purlin
Q235B, Q345B
C or Z shape, Steel purlin
Roof
Glass Wool Sandwich Panel
Wall
Glass Wool Sandwich Panel





Accessories
Bolts
Ordinary, High strength
Gutter
Galvanized Steel plate, Stainless steel
Windows
Aluminum alloy-Glass, Aluminum alloy-shutter, PVC
Doors
Sliding or Rolling door
Downpipes
PVC pipe, Color steel pipe
Edge Cover
Made of color steel sheet thickness 0.5mm
Ventilator
Stainless steel
Crane
Crane in 5 tons to 30 tons

Project Overviews
Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse



 



Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse

Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse

Payment and Delivery Terms

Payment Terms:T/T 30% as deposit, and the 70% balance before shipment
Packaging & Delivery: Seaworthy export standard, 20' GP, 40' GP, 40' HQ, 40' OT. 
Delivery Detail: 20-45 days


Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
 
After Sales Service

Our Service

1)Rich experience and professional team
With more than 10 years' experience, our employees have been professionally trained and evaluated , we can manufacture strictly according to your drawings and request or design by ourselves to provide you a most satisfactory solution to you.

2)Advanced equipment
We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry
planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and so on.

3)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection

4)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified

5)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
We offer One stop service from design, manufacture, deliver to installation and after-service.

Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
 
Company Profile

About Us

Established in 2011,Qingdao Taiwei Steel Structure Co., Ltd is a large-scale professional manufacturer specializing in designing, modeling, manufacturing and installing Steel Structure Projects.

Advanced equipment, great production capacity and prompt delivery that make us establish good relationship with more than 90 countries and regions:Canada,The United States,UAE,South Africa,Germany,France,Japan,Argentina,Venezuela and many other countries and regions. And we have participated in many significant construction projects, such as Argentine Workshop, Australian Aircraft Hanger, Mauritius Government Projects and so on.


Metal Light Steel Structure Construction Building Material Factory Workshop Warehouse
 
FAQ

FAQ

1.Are you a factory or trading company?

We're factory with competitive price.

2.How long is the service life of the portal H-type steel frame?

The service life of the main steel frame can last for 50years.

3.Is the steel frame safe and stable?

Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)

4.What is the advantages of the steel frame compared to the traditional building?

The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.   

5.How can I assemble the portal H-type steel frame?

All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier