Size: | Designed as Per Customer′s Requirement |
---|---|
Main Frame: | H Section Steel, C, Z Section Steel |
Design Parameter: | Wind Load, Snow Load, Earthquake |
Surface Treatment: | Painted or Galvanized |
Window: | Aluminum Alloy Window or Plastic Steel Window |
MOQ: | 200m2 |
Customization: |
---|
Suppliers with verified business licenses
Name of Building:Industrial Prefabricated Steel Structure Warehouse for Hangar(TW-KE002)
Structure System: Steel Portal Frame + Space Truss Structure
Area: 2452m2& 600 m2
Construction Site:Niger
1. Design data: | Wind load-0.75KN/m2; Roof Dead load-0.2KN /m2; Roof Live load-0.3kN/m2. |
2. Size of steel hangar: | 60m*40m*9m (Length* Width* Eave Height) |
3. Primary Steel Structure: |
Welded H section steel with primer and facing anti-rusting painting, which will be bolted together at site |
4. Secondary Framing: | C Purlin, Tie Bar, Roof and Wall Support are formed as secondary framing |
5. Bracing: | Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural building. |
6. Roof Materials: | V-950 Steel Sandwich Panel, 0.5mm/50mm Glasswool/0.5mm, White |
7. Wall Materials: | V-950 Steel Sandwich Panel, 0.5mm/50mm Glasswool/0.5mm, White |
8. Partition Wall: | V-950 Steel Sandwich Panel, 0.5mm/50mm Glasswool/0.5mm, White |
9. Window: | PVC Windows with security grills |
10. Door: | Hangar door, 38m length by 6.5m height |
11. Ceiling for inside office part: | Light steel keel + gypsum board |
12. Installation: | We dispatch our workers to do the installation with local workers together. |
2)Advanced equipment
We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and so on.
3)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection
4)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified 5)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
We offer One stop service from design, manufacture, deliver to installation and after-service.
Company Profiles
Suppliers with verified business licenses